Masterplan Image Assembly Bristol

Schedule
of Areas

Building A Areas

Let to BT

Building B Areas
close

Schedule
of Areas

Building B areas

Proposed floor areas sq.ft sq.m
6th floor 2,692 250
5th floor 4,515 419
4th floor 4,515 419
3rd floor 4,514 419
2nd floor 4,513 419
1st floor 4,513 419
Ground floor 1,808 168
Reception 929 86
Total 27,999 2,601
Building C Areas
close

Schedule
of Areas

Building C areas

Proposed floor areas sq.ft sq.m Balcony/ terrace sq.ft
Lower roof 1,160 108 5,301
11th floor 7,812 726 175
10th floor 7,812 726 175
9th floor 7,812 726 175
8th floor 7,812 726 175
7th floor 7,812 726 175
6th floor 7,812 726 175
5th floor 7,812 726 175
4th floor 7,812 726 175
3rd floor 7,812 726 175
2nd floor 7,812 726 175
1st floor 7,812 726 175
Upper ground 3,147 292 -
Reception 2,477 230 -
Total 92,716 8,616 7,226
close

Spec - Building B

Occupancy

  • Occupancy density 1:8 sq m

Floors and ceilings

  • 150mm (nominal) raised access floor
  • Typical floors – 2.80m floor to ceiling (if installed), 3.3m floor to soffit

Electrical services

  • LED Lighting: Offices 500 lux (target) at desk level Digital lighting control system
  • Daylight dimming & PIR Control
  • 1 x 13 person passenger lift
  • 1 x 21 person capacity (1,600kgs), doubles as a good lift

WCs and showers

  • Ground floor visitors WC
  • Each floor features WCs and a cleaners' cupboard
  • Shower and changing facilities

Mechanical Services: Office performance

  • Soffit mounted VRF comfort heating and cooling system
  • Fresh air provided by a roof mounted central air handling unit with thermal recovery

Energy, Sustainability and Health, Safety and Wellbeing

  • EPC - A
  • BREEAM - Excellent
  • WELL Enabled to allow tenants to complete their own bespoke assessments
  • Covid 19 measures include opening windows, fresh air rates exceed regulations, heat recovery equipment prevents cross contamination risk, on floor vent systems to reduce the risk from other tenancies

Parking spaces and access

  • 36 staff cycle spaces in a covered external enclosure

Landscaping

  • Extensive waterside public realm and new high quality estate landscaping
close

Spec - Building C

Occupancy

  • Occupancy density 1:8 sq m

Floors and ceilings

  • 150mm (nominal) raised access floor
  • Typical floors – 2.8m floor to ceiling (if installed), 3.3m floor to soffit

Electrical services

  • LED Lighting: Offices 500 lux (target) at desk level Digital lighting control system
  • Daylight dimming & PIR Control
  • 4 x 21 person passenger lifts capacity (1,600kgs), one of which will also act as a good lift, and one which will also act as a firefighting lift.

WCs and showers

  • Ground floor visitors WC
  • Each floor features superloos and a cleaners' cupboard
  • Shower and changing facilities in a combined “gym” style block on the lower and upper ground floors

Mechanical Services: Office performance

  • Soffit mounted VRF comfort heating and cooling system
  • Fresh air provided by two on floor air handling units (per floor) with thermal recovery
  • Openable windows for natural ventilation

Energy, Sustainability and Health, Safety and Wellbeing

  • EPC - A
  • BREEAM - Excellent
  • WELL Enabled to allow tenants to complete their own bespoke assessments
  • WiredScore – Platinum
  • Covid 19 measures include opening windows, fresh air rates exceed regulations, heat recovery equipment prevents cross contamination risk, on floor vent systems to reduce the risk from other tenancies

Parking spaces and access

  • 2 car parking spaces are provided on lower ground floor
  • Electric car charging points
  • 116 cycle spaces and 120 lockers, electric bike charging point and 6 Brompton lockers

Landscaping

  • Extensive waterside public realm and new high quality estate landscaping; landscaped roof terrace

Balconies & terraces

  • Private tenancy balconies are provided on most floors, on the south elevation.
  • A landscaped terrace shared by all occupants is located at roof level
Assembly Bristol